• Mud manifold unites and divides mud during drilling, in order to have enough mud to drill through top drive.
• Working pressure: 2000PSI~20000PSI
• Nominal Bore: 2.1/16"~4.1/16"(46mm~103mm)
• Working Medium: oil, natural gas, mud
• Working Temperature: -46°C~121°C(Class LU) |